Frequently Asked Questions

Answering your Questions

Find answers to common questions about our made-to-order trusses and frames, including lead times, delivery areas, and how our quoting process works.

Yes, you do! Creating an account with NewTruss is simple, with Cash Account or 30-day credit account options available. Want to create an account today? Follow this link.

Unfortunately, no. While NewTruss is in the NHS family, it is a separate business, so you will need to create a new account specifically for NewTruss. Want to create an account today? Follow this link.

The ordering process for NewTruss is as follows:

  1. Send plans for a quote
  2. Confirm scope and pricing
  3. We prepare shop drawings
  4. You approve/sign off
  5. We manufacture
  6. We schedule delivery

So that we can quote accurately, we ask that you please supply:

  • Architectural plans (via PDF)
  • Engineering drawings (if available)
  • Site address (to help confirm wind rating)
  • Roof type and pitch
  • Ceiling type (flat, raked, skillion)
  • Any special loads (tiles, solar, platforms, storage, etc.)
  • Preferred delivery timeframe


If engineering isn’t complete, we can generally provide an approximate budget estimate from architectural plans.

Lead times can vary depending on project size and workload. Please note, seasonal busy periods can also affect lead times.
As a general guide our lead times are:

  • Shop drawings/approval: timing depends on how quickly approvals are returned
  • Manufacturing: approximately 2–4 weeks after approval and confirmation of details
  • Delivery: scheduled around your build program and site access

We’ll always confirm final timing once plans are approved and signed off.

We’re based in Newcastle and supply throughout Newcastle, Lake Macquarie, Central Coast, Port Stephens, Lower Mid-North Coast, Maitland, Hunter Valley, Upper Hunter and the surrounding areas. Delivery availabilities will depend on site access and scheduling.
If you’re unsure if we can deliver to you, send us your suburb or postcode and we’ll gladly check and confirm.

For all deliveries we can arrange:

  • Standard delivery
  • Split drops
  • Crane unloading (site dependent)

Before manufacturing, we will confirm:

  • Street and driveway access
  • Turning/reversing space
  • Slab Dimensions
  • Overhead obstructions (i.e. powerlines, trees etc.)
  • Driveway width and slope
  • Drop zone accessibility near slab/platform
  • Street permission access


If access is tight, of if you will need to organise traffic control measures, let us know early so we can plan a safe delivery for your team and ours.

Yes, we can! You’ll receive layout drawings for review before manufacturing. Before approving we ask that you please check:

  • Overall dimensions
  • Set-out and bearing points
  • Truss types and locations
  • Girder/load points and posts
  • Roof pitch and overhangs
  • Any special requirements (bulkheads, service openings, etc.)

We can quote from architectural plans, but manufacturing generally requires:

  • Engineering or an engineered truss design
  • Confirmed wind rating and tiedown requirements
  • A finalised plan set (with all revisions completed)

Yes, we do! All trusses and wall frames are manufactured in line with relevant Australian Standards and project engineering requirements, including:

  • AS 1720.4 — Nail-plated timber roof trusses
  • AS 1684.4 — Residential timber framed construction

    note: Final compliance also depends on correct installation, bracing, and tiedown as per AS 4440

We use structurally graded timber (typically MGP) that is ethically sourced from sustainable suppliers. All timber is selected to meet Australian Standards and responsible forestry practices. Treatment levels (H2/H3) are selected based on project requirements and application. We can also use LVL (Laminated Veneer Lumber), selected based on the specific project requirements and application.

Timber often provides advantages in Newcastle and Hunter Valley builds:

  • Better thermal performance with less heat transfer than steel
  • Potential insulation and energy efficiency cost savings
  • Lower environmental impact due to renewable material and stored carbon
  • Easier handling onsite and quieter, simpler installation

At NewTruss, we can offer:

  • Preassembled wall panels
  • Numbered and labelled packs for easier installation
  • Bundled components (for stick building)


We’ll recommend the best option depending on site access, crane availability, and site handling.

A girder truss supports loads from other trusses or roof elements (hip ends, valley sets, etc.). A Girder will often require:

  • Specific bearing locations
  • Posts or lintels beneath
  • Coordination with wall frame layouts


Incorrect or missing girder supports can cause delays onsite, so early coordination is essential.

Yes, we do! We supply a full hardware package, including:

  • Bracing
  • Truss and frame brackets and connectors
  • Tiedown components as specified
  • Fixings (as required)


As a part of the NHS family, we can also assist with sourcing additional building products for the rest of your build by directing you through the Cardiff, Lambton, or Beresfield NHS stores.

We can supply frames for single and multistorey construction, including:

  • Load-bearing walls
  • Bracing requirements
  • Lintels and point load provisions (as per engineering)

Yes, we can! We design to suit the selected roof covering and nominated loads, including:

  • Tiled roofs
  • Metal roofing
  • Solar PV loads (when specified)
  • Ceiling and storage loads (where nominated)

Yes, provided this is specified at design stage. We can design:

  • Limited storage areas
  • Attic trusses
  • Plant platforms (A/C units, services, etc.)

All installation is completed by the builder or carpentry crew. Installs must follow:

  • Approved shop drawings
  • Bracing and tiedown requirements
  • Engineering notes and manufacturer instructions


 We can assist with guidance, but installation and onsite safety remain the responsibility of the installing builder.

Our products are designed using Mitek SAPPHIRE™ with full comprehensive 3D modelling. Builders can also combine this with the Mitek Viewer app (available on phone or desktop), which allows all truss designs to be reviewed before manufacturing.

Please note, if slab dimensions, set-out, steelwork, or wall positions differ from the supplied plans fit-up can be affected. Although rare, if you find an issue onsite:

  • Stop work and isolate the area
  • Take clear photos and measurements
  • Contact us immediately

We’ll then help you troubleshoot and find a solution.

No, they cannot be modified. Do not cut, drill, notch or alter trusses without written approval. Even small changes can affect structural integrity. If modifications are required (skylights, ducting, stair voids, services), please contact us for an engineered solution.

Yes, depending on documentation and project scope. You’re welcome to contact our team to run through requirements and to check if your project meets our requirements.

Owner builders should ensure:

  • Complete plans and engineering
  • Clear understanding of installation responsibilities and site safety

Still have questions?

Contact our team today — we’re here to help!

Building Confidence Into every frame
Building Confidence Into every frame
Building Confidence Into every frame
Sign Up

Cash Account

Sign up to our Cash Account where you receive benefits. This account type is subject to 50% deposit on order placement, and balance prior to delivery. Once you sign up we will get your account up and running, usually by the next business day.

Sign Up

30-Day Account

Apply for a NewTruss trade account and benefit from convenient 30-day payment terms, helping you keep your projects moving.

What are you searching for?